Bids will be received no later than 1:30 p.m. on the
indicated Date(s) for the Project(s) listed below.
Bids will open in the 4th
Floor Conference Room, Tampa Municipal Office Building,
306 E.
Jackson Street, Tampa, Florida 33602.
Pre-Bid Conferences
are held at the same location unless otherwise indicated.
Plans and Specifications for
this work may be examined at the Contract Administration Department,
306 E. Jackson Street,
4th Floor North, Tampa, Florida 33602. Copies may be obtained upon
payment of the refundable deposit indicated for each set. Deposits
are refunded if documents are returned in good condition within 15
days after bid opening. Deposits should be in the form of separate
checks for each project. Mailing is available for an additional
charge of $10.00 per set. Delivery via certain other parcel services
may be available by providing an account number. Checks should be
made payable to the City of Tampa. Subcontracting opportunities may
exist for the City certified Small Local Business Enterprises,
SLBE's, listed in the current directory at the
City of
Tampa's Minority Business Development office site.
Phone (813) 274-8456 for
assistance. Fax Technical Questions to (813) 274-8080.
Addenda will be posted below. Check Regularly.
Contract
Deposit
Estimate |
Bid Opening Date |
Title |
Scope |
Pre-Bid |
Downloadable
|
|
Addenda
|
Files |
|
08-C-00058 |
09/03/08 |
Cass Street Bridge Rehabilitation |
Structural
repair of superstructure and substructure of Cass Street Bridge over the
Hillsborough River including steel replacement, asbestos and lead
abatement, painting |
09/16/08 |
|
Bid Notice
Specifications
Plans
Original Plans
Asbestos Survey |
|
7-C-21 |
Canceled |
Fleet/Truck Vehicle Wash and Perimeter Wall Improvements |
The project provides for construction of a truck and vehicle wash
facility which includes site preparation, site work, concrete, masonry,
roofing, structural steel, overhead doors, electrical work,
pre-manufactured vehicle wash system. |
Canceled |
ADD 1 |
Bid Notice
Specifications
Plans
Planholders
|
|
08-C-00048 |
09/02/08 |
Old City Hall Historic Elevator Replacement |
The project provides for renovation of the historic elevator cab,
installation of elevator controls select equipment removal, electrical,
mechanical, structural modifications. |
08/19/08 |
LOC |
Bid Notice
Specifications
Plans
Planholders
|
|
08-C-00049 |
08/19/08 |
Tampa Convention Center Airwall Structural Improvements |
The project provides for structural
steel track fabrication and installation, fabrication and installation
of steel joists and beams; demolition work, masonry work, fire line and
chilled water pipe relocation, steel stair fabrication and installation. |
07/29/08 |
ADD 1
ADD 2
ADD2T
ADD 3
ADD 4
ADD 5
|
Bid Notice
Specifications
Plans
Planholders
|
06-C-00049 |
08/19/08 |
Interbay Pool ADA Improvements, PW6682 |
The project provides for construction
of new concrete accessible ramps, minor pool deck removal and
replacement, new pavers for pool deck, new concrete emergency access
drive, minor plumbing upgrades, decorative fencing, selective site
remediation. |
08/05/08 |
ADD 1
ADD 2
LOC
ADD 3 |
Bid Notice
Specifications
Plans
Planholders
|
|
08-C-00057 |
08/12/08 |
Poinsettia Avenue and 115th Street Stormwater Ponds Sediment Removal |
The project provides for furnishing all
labor, materials and equipment for the removal of approximately 14,000
c.y. of silt and sediment from the Poinsettia Avenue and the 115th
Street storm water ponds |
07/29/08 |
ADD 1 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
08-C-00043 |
08/12/08 |
Fire Station No's 13, 20 and 21 - Fuel Tank Improvements |
The project provides for removal and
disposal of two (2) underground fuel storage tanks at Fire Station No.
20; providing at each Fire Station No. 13 and 21, one (1) aboveground
dual-fuel storage tank and components, reinforced concrete slab and
bollards, and related site and electrical modifications.
|
07/29/08 |
ADD 1
ADD 2 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
08-C-00034 |
08/12/08 |
University Pumping Station Pump #2 Replacement |
The project provides for removal of
existing 75 HP pump, motor, valves and piping, concrete pedestal
supports, variable frequency drive and pump controls; construction
and/or installation of 350 HP pump, motor, valves and piping, concrete
pedestal supports, variable frequency drive, pump controls, power
transformer and transformer mounting platform |
07/29/08 |
LOC
ADD 1
ADD 2 |
Bid Notice
Specifications
Plans
Planholders
Pre-Bid Sign In Sheet
Bid Tab |
|
08-C-00033 |
08/12/08 |
Norfolk Street and Packwood Avenue Stormwater Improvements |
The project provides
for construction of approximately 173 LF of 15” RCP & 632 LF of 18” RCP
stormwater system including inlets, manholes, driveways, water main
offset, and reestablishment of ditches. |
07/29/08 |
ADD 1
ADD 2 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
08-C-00054 |
07/29/08 |
Howard F. Curren AWTP Painting FY08 |
Application of exterior coating system on approximately 13,500 ft of
piping associated with the HFC AWTP sludge storage tanks and sludge
drying beds. |
07/15/08 |
|
Bid Notice
Specifications
Plans
Pictures
Planholders
Bid Tab |
|
08-C-00006 |
08/12/08 |
Kennedy Blvd Landscaping and Enhancements Woodlynn Ave to Hillsborough
Bridge |
Installation of landscaping, irrigation systems, brick banding to
existing sidewalks and decorative crosswalks. |
07/15/08 |
ADD 1
ADD 2 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
7-C-70 |
07/22/08 |
Tampa Convention Center HVAC Improvements |
The project provides for replacement of the existing inoperable 1,450
ton chiller (CH-3) with a new 1,450 ton chiller; replacement of two120
ton chillers with two new 200 ton chillers. |
07/08/08 |
ADD 1 |
Bid Notice
Specifications
Plans
Planholders
LOC
Bid Tab |
|
08-C-00041 |
08/05/08 |
David L. Tippin Water Treatment Facility Sedimentation Basin Nos. 5-8
Rehabilitation, Repair and
Maintenance |
The project provides for removal and
replacement of existing grout topping on the floor of three (3) Sludge
Thickener Tanks; partial removal of failing concrete/coatings |
07/08/08 |
ADD 1
ADD 2
ADD 3 |
Bid Notice
Specifications
Plans
Planholders
Pre-Bid Attendance List
Bid Tab |
|
08-C-00024 |
08/05/08 |
40the Street Corridor Project-Segment C from River Pines Apartments to
Humphrey Street |
Roadway reconstruction of 40th Street from River Pines Apartments to
Humphrey Street consisting of asphalt paving, curb & gutter, sidewalk,
stormwater pipe and structures. |
06/24/08 |
ADD 1
ADD 2
ADD 3
ADD 4
ADD 5 |
Bid Notice
Plans
Specifications
Planholders
FDOT Requirements
Bid Tab |
|
08-C-00020 |
07/15/08 |
Fletcher Avenue Force Main Replacement Rome Avenue to North Boulevard |
Construction of approximately 2,393 LF of 10-inch HDPE pipe by
directional bore, reconnection of six private forc3e mains, sidewalk and
pavement restoration. |
N/A |
ADD 1
ADD 2 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
08-C-00051 |
07/15/08 |
Furnish and Install Miscellaneous Water Mains from 2” to 42” Diameter –
FY 08 |
The project provides for furnishing and installing water mains and
appurtenances for water mains ranging in size from 2” to 42” in diameter
including concrete masonry, curbs and sidewalks; paving, landscaping,
grouting, brick street construction. |
07/01/08 |
ADD 1
ADD 2
Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
|
Bid Notice
Specifications
Planholders
Bid Tab |
|
08-C-00031 |
07/1/08 |
Tampa Bay Boulevard Stormwater Improvements |
Construction of a stormwater pipe system including inlets, manholes,
asphalt replacement, concrete sidewalks and driveways and sodding. |
06/17/08 |
ADD 1
ADD 2 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
08-C-00017 |
07/01/08 |
Humphrey Pumping Station Rehabilitation |
To convert the existing ejector station to a submersible pumping
station. |
06/10/08 |
ADD 1
LOC |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
08-C-00007 |
06/03/08 |
Bruce B. Downs Wastewater Relief Force Main |
Construction of 3,250 LF of 24-inch HDPE Pipe and pavement restoration. |
05/20/08 |
ADD 1 |
Bid Notice
Specifications
Plans
Soil borings
Planholders
Bid Tab |
|
08-C-00022 |
05/20/08 |
Howard F. Curren AWTP Main Pump Station Wet Well Rehabilitation |
Rehabilitation of 8,300 SF of corroded concrete wet well walls. |
04/29/08 |
ADD 1
ADD 2
ADD 3 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
08-C-00040 |
05/20/08 |
Interbay Repump Station Improvements |
Improvements to the existing Interbay Repump Station to maintain
adequate pressure in the distribution system and accommodate future
growth within the service area. |
04/29/08 |
ADD 1
ADD 2
ADD 3
ADD 4 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
6-C-13 |
05/20/08 |
Ybor City Streetscape Improvements-22nd St to 26th St |
Sidewalk improvements with associated landscaping, lighting and all
associated work. |
04/29/08 |
ADD 1
|
Bid Notice
Specifications
Plans
Planholders
Letter of Clarification
Bid Tab |
|
08-C-00018 |
05/06/08 |
Howard F. Curren AWTP Drying Beds Rehabilitation, Phase 1 |
Furnish labor and materials, and equipment to extend 12-inch sludge
drying bed drain pipes and install manholes in order to clean and
TV-inspect the drain pipes. |
04/22/08 |
ADD 1 |
Bid Notice
Planholders
Specifications
Plans
Inspection Video
Bid Tab |
|
6-C-79 |
04/29/08 |
Centennial Park |
General site work for the central portion of the park including plaza,
stage, brick retaining wall, concrete, brick banding, electrical,
pavement restoration. |
04/15/08 |
|
Bid Notice
Planholders
Specifications
Plans
Bid Tab |
|
08-C-00019 |
04/29/08 |
Howard F Curren AWTP Final Sedimentation Tanks Rehabilitation, Phase 1 |
Removal of existing cross collector flights, shafts and wear strips in
six sedimentation tanks. |
04/15/09 |
ADD 1 |
Bid Notice
Specifications
Plans
Planholders
Bid Tab |
|
08-C-00032 |
04/08/08 |
Columbus Drive Municipal Office Building HVAC Replacement and Upgrades |
Replacement of existing rooftop HVAC equipment. |
03/18/08 |
ADD 1
ADD 2
ADD 3 |
Bid Notice
Planholders
Specifications
Plans
Bid Tab |
|
08-C-00016 |
04/01/08 |
Howard F. Curren AWTP Sludge Storage Tanks Rehabilitation |
The project provides for furnishing all
labor, materials, and equipment to remove existing mixing equipment and
tank baffles. |
03/18/08 |
ADD 1 |
Bid Notice
Planholders
Bid Tab |
|
7-C-26 |
04/01/08 |
Fire Station No. 1 Roof Improvements |
Removal of existing roof membrane and installation of built-up roof
membrane. |
03/18/08 |
ADD 1
ADD 2
ADD 3 |
Bid Notice
Planholders
Bid Tab |
|
7-C-94 |
04/29/08 |
Ballast Point Park Pier Improvements |
Rehabilitation of the existing fishing pier encasement of degraded
concrete bent caps and piles. |
02/19/08 |
ADD 1
ADD 2
ADD 3
ADD 4 |
Bid Notice
Planholders
Bid Tab
Specifications |
|
08-C-00026 |
03/18/08 |
Manhole Rehabilitation by Structural Coating System |
Rehabilitate 41 Manholes in the Bayshore, Bush, and Platt Interceptors
by installation of a structural coating system. |
02/26/08 |
ADD 1 |
Bid Notice
Planholders
Bid Tab |
|
08-C-00023 |
03/11/08 |
Annual Wastewater Force Main Replacement |
Construction of 6,150 linear feet of 4-inch through 12-inch diameter
PVC, HDPE and/or DIP force main sewer pipe. |
|
ADD 1
ADD 2 |
Bid Notice
Planholders
Bid Tab |
|
6-C-53 |
02/26/08 |
Robles Park Roof Replacement |
Renovation of portions of the entry roofs at the Robles Park Building. |
2/12/088 |
|
Bid Notice
Planholders
Bid Tab |
|
08-C-00008 |
03/04/08 |
Lake Kipling Urban Lakes Rescue |
Construction of three pre-cast concrete sediment traps including removal
of excess sediment from Lake Kipling. |
02/12/08 |
ADD 1
ADD 2
ADD 3 |
Bid Notice
Planholders
Bid Tab |
|
08-C-00025 |
01/22/08 |
Waverly Place Stormwater Pipe Relocation |
Construction of concrete stormwater system. |
|
ADD 1 |
Bid Notice
Planholders
Bid Tab
Award |
|
08-C-00009 |
01/22/08 |
Temple Heights Road Stormwater Improvements |
Construction of stormwater pipe system to reduce flooding in
neighborhood. |
|
|
Bid Notice
Planholders
Bid Tab |
|
08-C-00004 |
01/22/08 |
Kinnan Pumping Station Rehabilitation |
Removal and installation of control equipment, emergency generators,
station piping, pumps, valves, access cover doors, chain link fence,
water service. |
01/08/08 |
ADD 1
ADD 2
|
Bid Notice
Planholders
Bid Tab |
|
08-C-00003 |
01/22/08 |
Manhole Rehabilitation of Clark Phase 2 and Various Interceptors |
Rehabilitate 80 manholes in various locations throughout the City of
Tampa. |
12/18/07 |
ADD 1
ADD 2
ADD 3 |
Bid Notice
Planholders
Bid Tab
Award |
|
07-C-00081 |
01/08/08 |
HFC AWTP Heat Drying Facility Rehabilitation |
Rehabilitate the building roof and gutter system, replace interior
structural members, and apply corrosion control coating system on
interior steel components.
Bid Has Been Cancelled |
11/13/07 |
ADD 1
ADD 2 |
Bid Notice
Planholders |
|
08-C-00002 |
01/08/08 |
Sewer Rehabilitation by Cured-in-Place Pipe (C.I.P.P.) Small Diameter
FY08 |
The rehabilitation of gravity sewers from 8-inch diameter to 12-inch
diameter at various locations throughout the City of Tampa. |
|
ADD 1 |
Bid Notice
Planholders
Bid Tab
Award |
|
7-C-75 |
12/18/07 |
Tampa Reclaimed Water System Performance Improvements |
Construct test and maintain reclaimed water flushing services and new
system appurtenances for the reclaimed water system, and conducting a
unidirectional flushing of the transmission main, distribution piping
and service lines. |
12/04/07 |
ADD 1 |
Bid Notice
Planholders
Bid Tab |
|
7-C-10 |
11/27/07 |
Cypress Point Park Shoreline Stabilization |
Removing of sand berms and bars, providing groins system, beach sand,
plantings, complying with permit requirements. |
11/06/07 |
ADD 2 |
Bid Notice
Planholders
Bid Tab
Award |
|
08-C-00001 |
11/20/07 |
Wastewater Gravity Sewer Construction FY08 |
Construction of 2600 linear feet of 6 and 8 inch diameter PVCP,
including asphalt pavement restoration, concrete driveway and sidewalk
restoration, sodding. |
|
ADD 1
ADD 2 |
Bid Notice
Planholders
BidTab
Award |
7-C-43
$20.00
$970,000 |
10/9/07 |
Sewer Rehabilitation by Cured-in-Place Pipe FY07 |
The rehabilitation of gravity sewers from 8-inch diameter to 36-inch
diameter at various locations throughout the City. |
|
ADD 1
ADD 2 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-79
$20.00
$500,000 |
9/11/07 |
Howard F, Curren AWTP Chlorination System Upgrade Phase 2 |
Installation of a complete chlorine and sulfur dioxide system. |
8/21/07 |
ADD 1
ADD 2 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-69
$20.00
$575,000 |
8/28/07 |
River Garden Park Shoreline Restoration |
Restoration of approximately 2000 linear feet of Hillsborough River
shoreline within the River Garden Park. |
7/24/07 |
ADD 1
ADD 2
ADD 3
ADD 4 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-63
$20.00
$160,000 |
8/28/07 |
TPD Aviation Unit Fuel Tank Replacement |
Replaces an underground fuel storage tank with an above ground fuel
storage tank for the TPD Aviation Unit. |
8/14/07 |
ADD 1 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-61
$20.00
$435,000 |
8/28/07 |
New Tampa Nature Park Improvements |
Work shall include 1/2 mile entrance road, asphalt parking lot of 24
spaces, stormwater control elements, concrete walks, 1/2 mile asphalt
trail. |
7/31/07 |
ADD 1
ADD 2
ADD 3
LOC 1 |
Bid Notice
Planholders
Bid Tab |
7-C-76
$20.00
$530,000 |
8/21/07 |
Howard F. Curren AWTP Digester No. 6 Rehabilitation, Phase 1 |
Transport and dispose of waste materials stored in the drying beds at
the Howard F. Curren Advanced Wastewater Treatment Plant. |
8/07/07 |
LOC 1 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-31
$20.00
$190,000 |
8/21/07 |
Twiggs Street Garage Improvements |
Concrete restoration work up to full depth for slabs, beams and columns
on the top levels of the garage including the installation of
supplemental drains. |
8/07/07 |
|
Bid Notice
Planholders
Bid Tab
Award |
6-C-54
$20.00
$300,000 |
8/21/07 |
Cypress Point Park Restroom Building |
Installation of pre-fabricated building, including foundation, testing
and inspections. |
7/24/07 |
ADD 1 |
Bid Notice
Planholders
Bid Tab |
7-C-20
$20.00
$210,000 |
8/14/07 |
San Carlos Pumping Station Flow Meter Replacement and Emergency Bypass
Connection |
Installation of 2 flow meters at the San Carlos Pumping station with all
associated piping modifications. |
7/24/07 |
ADD 1 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-15
$20.00
300,000 |
8/07/07 |
Cancer Survivor Park Drainage Ditch Improvements |
Installing precast reinforced piping into an existing open ditch and
filling the slope to provide overhead cover. |
7/24/07 |
ADD 1
ADD 2 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-84
$20.00
$400,000 |
7/31/07 |
Lake Roberta-Urban Lake Rescue Project |
The project provides construction of approximately 250 If 2 grate
inlets, 1 endwall. |
7/17/07 |
ADD 1
LOC 1 |
Bid Notice
Planholders
Bid Tab
Award |
6-C-77
$20.00
$200,000 |
7/17/07 |
Fire Training Burn Prop. |
The project provides for the design and engineering manufacturing,
transporting, permitting and installation of modular containers to
provide a fire training burn building that complies with, or provides
for future compliance with, Florida Statue 69A-37, including tie-downs,
utility connections. |
N/A |
ADD 1 |
Bid Notice
PlanHolders
Bid Tab
Award |
7-C-54
$20.00
$400,000 |
7/17/07 |
46th Street and Riverhills Drive Stormwater Sediment Trap |
The project provides for furnishing all labor, materials and equipment
for construction of approximately 177 l.f. of 18" diameter, 155 l.f. of
24" diameter, and 16 l.f. of 19" x 30" elliptical stormwater pipe, 1
doghouse manhole, 6 inlets, 1 headwall including riprap, clean fill, and
one precast concrete stormwater sediment trap structure and diversion
box including roadway base, stabilization, force main offsets, water
line adjustments, asphalt paving, concrete sidewalks and driveways,
sodding, root pruning. |
N/A |
ADD
1 |
Bid Notice
Plan Holders
Bid Tab
Award |
7-C-33
$20.00
$500,000 |
7/17/07 |
Annual Wastewater Force Main Replacement |
Construction of miscellaneous wastewater force mains at various
locations throughout the City. |
N/A |
ADD
1 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-52
$20.00
$345,000 |
7/10/07 |
Howard F. Curren AWTP Nitrification Pumps AFD Replacement |
Removal of 5 existing frequency drives and 2 speed motor controllers the
replacement of 7 new AFD's and all associated work required. |
6/26/07 |
|
Bid Notice
Planholders
Bid Tab
Award |
7-C-82
$20.00
$208,000 |
06/26/07 |
West Columbus Drive and Riverside Drive Stormwater Sediment Trap |
Project provides for furnishing all labor and construction of one
stormwater sediment trap. |
N/A |
ADD 1
ADD
2 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-55
$20.00
$300,000 |
06/26/07 |
Curb and Gutter Construction-Citywide |
Construction of concrete curb and gutter at various locations throughout
the City. |
N/A |
ADD 1
|
Bid Notice
Planholders
Bid Tab
Award |
7-C-51
$20.00
$850,000 |
06/26/07 |
Sierra Circle Stormwater Pipe Relocation, Phase 1 |
Construction of concrete pipe storm sewer, including inlets, manholes,
concrete curbing and driveways. |
06/12/07 |
ADD 1
ADD
2
LOC 1
LOC 2
|
Bid Notice
Planholders
Bid Tab
Award |
7-C-34
$20.00
$690,000 |
06/12/07 |
City-Wide Traffic Calming Devices FY07 |
Project provides for
construction and installation of various traffic calming devices
including the installation of speed tables, signage, pavement markings,
sidewalks, curbing, landscaping and asphalt pavement |
05/29/07 |
|
Bid Notice
Planholders
Bid Tab
Award |
7-C-53
$20.00
$19,000,000 |
05/22/07 |
Water Main Construction |
Project provides for
furnishing
and installing water mains and appurtenances for water mains ranging in
size from 2” to 42” in diameter. |
05/08/07 |
ADD 1
|
Bid Notice
Planholders
Bid Tab
Award |
7-C-7
$20.00
$220,000 |
05/22/07 |
Sidewalk Construction FY07 Bayshore Blvd and East Tampa |
Construction of sidewalks and installation of pedestrian ramps at
various locations. |
03/20/07 |
ADD 1
ADD 2
ADD 3
ADD 4 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-17
$20.00
$575,000 |
05/17/07 |
Carmen Pumping Station Rehabilitation and Force Main Replacement |
Rehabilitation of
Carmen Pumping Station located at 3606 W. Carmen Street and the
replacement of the station's discharge force main. The force
main
replacement consists of installing approximately 1,735 of 8" PVC/HDPE
pipe. |
N/A |
ADD 1 |
Bid Notice
Planholders
Bid Tab
Award |
6-C-12
$20.00
$1,145,000 |
04/24/07 |
Cyrus Green Pool Improvements |
Demolition of south wall of existing pool, construction of new pool
decks, renovation of existing equipment building |
03/27/07 |
ADD 1
ADD 2
ADD 3
ADD 4 |
Bid Notice
Planholders
Bid Tab
Award |
6-C-71
$20.00
$177,000 |
04/10/07 |
Picnic Island Park Restroom Improvements (SBE Project) |
Renovation of 468 S.F launch area restrooms; renovation of 622 S.F beach
area restrooms and construction of 165 S.F addition to the beach area
restrooms. Small Business Enterprise set aside project. Only City
certified SBE firms are eligible to bid. |
03/27/07 |
ADD 1
|
Bid Notice
Planholders
Bid Tab
Award |
7-C-9
$20.00
$700,000 |
04/10/07 |
Woodland Terrace Community Center Addition |
Construction of a new 3,000 s.f. addition to the existing structure. |
03/27/07 |
ADD 1 |
Bid Notice
Planholders
Bid Tab
Award |
7-C-41
$20.00
$1,100,000 |
04/10/07 |
Wellswood Ballfield Lighting Improvements |
Replacement of all existing field lighting, poles, fixtures and all
related accessories and associated electrical power equipment and wiring
for 6 ball fields. |
03/13/07 |
ADD 1 |
Bid Notice
Planholders
Bid Tab
Award |
6-C-56
$20.00
$185,000 |
01/16/07 |
Jefferson and Whiting Streets Signal Installation |
Construction of Traffic Signal Installation Safety Project at the
intersection of Jefferson and Whiting Streets including directional
bore. |
|
ADD 1 |
Planholders
Bid Notice
Bid Tab
Award |
6-C-57
$50.00
1,650,000 |
01/09/07 |
Tampa Riverwalk Segment 8 (FKA 2A) under Platt Street Bridge |
The proposed work comprises construction of a pile-supported concrete
pedestrian bridge, precast concrete slabs, rubble rip-rap, including
benches, lighting and trash receptacles. |
10/17/06 |
ADD 1
ADD 2
ADD 3
ADD 4 |
Planholders
Bid Notice
Bid Tab
Award |
7-C-8
$20.00
$320,000 |
11/7/06 |
North Nebraska Ave Wastewater System Rehabilitation by Cured-in-Place
Pipe Kennedy Blvd to Hillsborough Ave |
Rehabilitation of approximately 4,485 lf of 8-inch diameter, 1,665 lf of
10-inch diameter and 360 lf of 12-inch diameter sanitary sewers by a
Cured-in-Place process. |
|
ADD 1 |
Planholders
Bid Notice
Bid Tab
Award |
7-C-2
$20.00
$500,000 |
10/31/06 |
Citywide Stormwater Rehabilitation by Cured-in-Place Pipe |
The proposed work comprises furnishing labor, materials, and equipment
to rehabilitate, by installation of a cured-in-place liner, gravity
stormwater pipes. |
|
ADD 1 |
Planholders
Bid Notice
Bid Tab
Award |
7-C-5
$20.00
$220,000 |
10/24/06 |
Sidewalk Construction New CDBG FY07 |
The project provides for construction of sidewalks and installation of
pedestrian ramps at various locations throughout the City. |
10/10/06 |
ADD 1 |
Planholders
Bid Notice
Bid Tab
Award |
7-C-4
$20.00
$700,000 |
10/24/06 |
Annual Wastewater Gravity Sewer Construction FY07 |
The project consist of furnishing all labor, materials and equipment for
the construction of approximately 3,600. |
|
ADD 1
ADD 2 |
Planholders
Bid Notice
Bid Tab
Award |
6-C-39
$20.00
$200,000 |
10/10/06 |
Swann Pumping Station Electrical Upgrade |
Upgrade the electrical service from a 240 VAC system to a 480 VAC
including installation of a new motor control center, pump motors and
controls. |
8/22/06 |
ADD 1
ADD 2
ADD 3 |
Planholders
Bid Notice
Bid Tab
Award |
6-C-78
$20.00
$240,000 |
10/10/06 |
Hanna and Trout Pumping Stations Standby Power Facility Re-bid |
The work includes installation and commissioning of standby power
facilities at the Hanna and Trout Pumping Stations including
installation of a new generator, fuel tank, and automatic transfer
switch and controls at each pumping station. |
N/A |
ADD 1
ADD 2
ADD 3
|
Planholders
Bid Notice
Bid Tab
Award
|
6-C-5
$20.00
$1,000,000
|
09/26/06 |
Parking Access and Revenue Control System at Ft. Brooke, Whiting Street
and Twiggs Street Garage |
Construction of a fully integrated, on-line real time parking access and
revenue control system. |
07/25/06 |
|