...route to the City of Tampa home page
Contract Administration

Quick Links


Construction Project Bidding

Bids will be received no later than 1:30 p.m. on the indicated Date(s) for the Project(s) listed below.

Bids will open in the 4th Floor Conference Room, Tampa Municipal Office Building, 306 E. Jackson Street, Tampa, Florida 33602.

Pre-Bid Conferences are held at the same location unless otherwise indicated.

Plans and Specifications for this work may be examined at the Contract Administration Department, 306 E. Jackson Street, 4th Floor North, Tampa, Florida 33602. Copies may be obtained upon payment of the refundable deposit indicated for each set. Deposits are refunded if documents are returned in good condition within 15 days after bid opening. Deposits should be in the form of separate checks for each project. Mailing is available for an additional charge of $10.00 per set. Delivery via certain other parcel services may be available by providing an account number. Checks should be made payable to the City of Tampa. Subcontracting opportunities may exist for the City certified Small Local Business Enterprises, SLBE's, listed in the current directory at the City of Tampa's Minority Business Development office site.

Phone (813) 274-8456 for assistance.  Fax Technical Questions to (813) 274-8080.

Addenda will be posted below. Check Regularly.

Bids

RSS feed  More Options
October 22, 2008 - Bid - Contract 08-C-00027; Bern's Park Fountain Improvements.
Bid Opening: 1:30 PM, Tuesday November 25, 2008
Pre-Bid: Novemeber 4, 2008 
Addenda: ADD 1, ADD 2, ADD 3
Download: Bid Notice, Specifications, Plans, Plan Holders  
October 22, 2008 - Bid - Contract 7-C-60; Seminole Garden Center Improvements
Bid Opening: 1:30 PM, Tuesday December 2, 2008
Pre-Bid: Novemeber 18, 2008 
Addenda: Addendum1
Download: Bid Notice, Specifications, Plans, Planholders , PreBid Sign In, LOC ,
October 22, 2008 - Bid - Contract 08-C-00055; Howard F. Curren AWTP Roofing Installation. FY09.
Bid Opening:
1:30 PM, Tuesday December 2, 2008
Site Visit: Novemeber 19, 2008 at 9:30 AM. 
Addenda:
Download: Bid Notice, Specifications, Plans, Planholders  
October 10, 2008 - Bid - Contract 09-C-00002; Stormwater Rehabilitation by Cured-In-Place Pipe FY-09.
Bid Opening:
1:30 PM, Tuesday November 4, 2008
Pre-Bid: N/A
Addenda:  ADD 1
Download:
Bid NoticeSpecificationsPlanholders, Bid Tab  
October 10, 2008 - Bid - Contract; 08-C-00037; North Boulevard Siphon Rehabilitation.
Bid Opening:
1:30 PM, Tuesday, November 25, 2008
Pre-Bid Conference: N/A
Addendas: ADD 1, ADD 1 DrawingsinColor, ADD 2
Download:
Bid Notice, Plans, Specifications, Planholders  
October 10, 2008 - Bid - Contract 08-C-00045; Citywide Roadway Improvements FY09-10
Bid Opening:
1:30 PM, Tuesday, November 18, 2008
Pre-Bid Conference: N/A
Addenda:  ADD 1, ADD 2
Download:  Bid Notice,  Specifications, Planholders  
 

   
Contract
Deposit
 Estimate
Bid Opening Date Title Scope Pre-Bid

Downloadable

Addenda Files
6-C-49 10/21/08 Interbay Pool Restroom Renovations and Pool Deck Repair The project provides for construction of new concrete accessible ramps, minor pool deck removal and replacement, new pavers for pool deck, new concrete emergency access drive, minor plumbing upgrades, decorative fencing, selective site remediation. 09/30/08 ADD 1
ADD 2 LOC
LOC 2
Bid Notice
Plans
Specifications
Soils Report
Planholders
Bid Tab
6-C-11 09/23/08 Centro Ybor Garage Restroom Improvements The project provides for construction of a new public restroom facility with limited demolition, civil, mechanical, electrical, plumbing, masonry, finishes and furnishings. 09/09/08 ADD 1 Bid Notice
Specifications
Plans
Planholders
SLBEs
Ex As Built
Bid Tab
08-C-00058 10/14/08 Cass Street Bridge Rehabilitation Structural repair of superstructure and substructure of Cass Street Bridge over the Hillsborough River including steel replacement, asbestos and lead abatement, painting 09/30/08 ADD 1
ADD 2
ADD 3
Bid Notice
Specifications
Plans
Original Plans
Asbestos Survey
Lead Survey
Planholders
Pre-Bid Sign In Sheet
Bid Tab
7-C-21 Cancelled Fleet/Truck Vehicle Wash and Perimeter Wall Improvements The project provides for construction of a truck and vehicle wash facility which includes site preparation, site work, concrete, masonry, roofing, structural steel, overhead doors, electrical work, pre-manufactured vehicle wash system. Cancelled ADD 1 Bid Notice
Specifications
Plans
Planholders
08-C-00048 10/21/08 Old City Hall Historic Elevator Replacement The project provides for renovation of the historic elevator cab, installation of elevator controls select equipment removal, electrical, mechanical, structural modifications. 08/19/08 LOC
ADD 1
ADD 2
ADD 3
ADD 4
ADD 5
Bid Notice
Specifications
Plans
Planholders
Bid Tab
08-C-00049 08/26/08 Tampa Convention Center Airwall Structural Improvements The project provides for structural steel track fabrication and installation, fabrication and installation of steel joists and beams; demolition work, masonry work, fire line and chilled water pipe relocation, steel stair fabrication and installation. 07/29/08 ADD 1
ADD 2
ADD2T
ADD 3
ADD 4
ADD 5
Bid Notice
Specifications
Plans
Planholders
Bid Tab
06-C-00049 08/26/08 Interbay Pool ADA Improvements, PW6682 The project provides for construction of new concrete accessible ramps, minor pool deck removal and replacement, new pavers for pool deck, new concrete emergency access drive, minor plumbing upgrades, decorative fencing, selective site remediation. 08/05/08 ADD 1
ADD 2
LOC
ADD 3
LOC2
Bid Notice
Specifications
Plans
Planholders
Bid Tab
08-C-00057 08/12/08 Poinsettia Avenue and 115th Street Stormwater Ponds Sediment Removal The project provides for furnishing all labor, materials and equipment for the removal of approximately 14,000 c.y. of silt and sediment from the Poinsettia Avenue and the 115th Street storm water ponds 07/29/08 ADD 1 Bid Notice
Specifications
Plans
Planholders
Bid Tab
08-C-00043 08/12/08 Fire Station No's 13, 20 and 21 - Fuel Tank Improvements The project provides for removal and disposal of two (2) underground fuel storage tanks at Fire Station No. 20; providing at each Fire Station No. 13 and 21, one (1) aboveground dual-fuel storage tank and components, reinforced concrete slab and bollards, and related site and electrical modifications.  07/29/08 ADD 1
ADD 2
Bid Notice
Specifications
Plans
Planholders
Bid Tab
08-C-00034 08/12/08 University Pumping Station Pump #2 Replacement The project provides for removal of existing 75 HP pump, motor, valves and piping, concrete pedestal supports, variable frequency drive and pump controls; construction and/or installation of 350 HP pump, motor, valves and piping, concrete pedestal supports, variable frequency drive, pump controls,  power transformer and transformer mounting platform 07/29/08 LOC
ADD 1
ADD 2

 

Bid Notice
Specifications
Plans
Planholders
Pre-Bid Sign In Sheet
Bid Tab
08-C-00033 08/12/08 Norfolk Street and Packwood Avenue Stormwater Improvements The project provides for construction of approximately 173 LF of 15” RCP & 632 LF of 18” RCP stormwater system  including inlets, manholes, driveways, water main offset, and reestablishment of ditches. 07/29/08 ADD 1
ADD 2
Bid Notice
Specifications
Plans
Planholders
Bid Tab
08-C-00054 07/29/08 Howard F. Curren AWTP Painting FY08 Application of exterior coating system on approximately 13,500 ft of piping associated with the HFC AWTP sludge storage tanks and sludge drying beds. 07/15/08   Bid Notice
Specifications
Plans
Pictures
Planholders
Bid Tab
Award
08-C-00006 08/12/08 Kennedy Blvd Landscaping and Enhancements Woodlynn Ave to Hillsborough Bridge Installation of landscaping, irrigation systems, brick banding to existing sidewalks and decorative crosswalks. 07/15/08 ADD 1
ADD 2
Bid Notice
Specifications
Plans
Planholders
Bid Tab
7-C-70 07/22/08 Tampa Convention Center HVAC Improvements The project provides for replacement of the existing inoperable 1,450 ton chiller (CH-3) with a new 1,450 ton chiller; replacement of two120 ton chillers with two new 200 ton chillers. 07/08/08 ADD 1 Bid Notice
Specifications
Plans
Planholders
LOC
Bid Tab
Award
08-C-00041 08/05/08 David L. Tippin Water Treatment Facility Sedimentation Basin Nos. 5-8 Rehabilitation, Repair and Maintenance The project provides for removal and
replacement of existing grout topping on the floor of three (3) Sludge Thickener Tanks; partial removal of failing concrete/coatings
07/08/08 ADD 1
ADD 2
ADD 3
Bid Notice
Specifications
Plans
Planholders
Pre-Bid Attendance List
Bid Tab
08-C-00024 08/05/08 40the Street Corridor Project-Segment C from River Pines Apartments to Humphrey Street Roadway reconstruction of 40th Street from River Pines Apartments to Humphrey Street consisting of asphalt paving, curb & gutter, sidewalk, stormwater pipe and structures. 06/24/08 ADD 1
ADD 2
ADD 3
ADD 4
ADD 5
Bid Notice
Plans
Specifications
Planholders
FDOT Requirements
Bid Tab
08-C-00020 07/15/08 Fletcher Avenue Force Main Replacement Rome Avenue to North Boulevard Construction of approximately 2,393 LF of 10-inch HDPE pipe by directional bore, reconnection of six private forc3e mains, sidewalk and pavement restoration. N/A ADD 1
ADD 2
Bid Notice
Specifications
Plans
Planholders
Bid Tab
Award
08-C-00051 07/15/08 Furnish and Install Miscellaneous Water Mains from 2” to 42” Diameter – FY 08 The project provides for furnishing and installing water mains and appurtenances for water mains ranging in size from 2” to 42” in diameter including concrete masonry, curbs and sidewalks; paving, landscaping, grouting, brick street construction. 07/01/08 ADD 1
ADD 2
Item 1
Item 2
Item 3
Item 4
Item 5
Item 6
Bid Notice
Specifications
Planholders
Bid Tab
Award
08-C-00031 07/1/08 Tampa Bay Boulevard Stormwater Improvements Construction of a stormwater pipe system including inlets, manholes, asphalt replacement, concrete sidewalks and driveways and sodding. 06/17/08 ADD 1
ADD 2
Bid Notice
Specifications
Plans
Planholders
Bid Tab
Award
08-C-00017 07/01/08 Humphrey Pumping Station Rehabilitation To convert the existing ejector station to a submersible pumping station. 06/10/08 ADD 1
LOC
Bid Notice
Specifications
Plans
Planholders
Bid Tab
Award
08-C-00007 06/03/08 Bruce B. Downs Wastewater Relief Force Main Construction of 3,250 LF of 24-inch HDPE Pipe and pavement restoration. 05/20/08 ADD 1 Bid Notice
Specifications
Plans
Soil borings
Planholders
Bid Tab
Award
08-C-00022 05/20/08 Howard F. Curren AWTP Main Pump Station Wet Well Rehabilitation Rehabilitation of 8,300 SF of corroded concrete wet well walls. 04/29/08 ADD 1
ADD 2
ADD 3
Bid Notice
Specifications
Plans
Planholders
Bid Tab
Award
08-C-00040 05/20/08 Interbay Repump Station Improvements Improvements to the existing Interbay Repump Station to maintain adequate pressure in the distribution system and accommodate future growth within the service area. 04/29/08 ADD 1
ADD 2
ADD 3
ADD 4
Bid Notice
Specifications
Plans
Planholders
Bid Tab
Award
6-C-13 05/20/08 Ybor City Streetscape Improvements-22nd St to 26th St Sidewalk improvements with associated landscaping, lighting and all associated work. 04/29/08 ADD 1
Bid Notice
Specifications
Plans
Planholders
Letter of Clarification
Bid Tab
Award
08-C-00018 05/06/08 Howard F. Curren AWTP Drying Beds Rehabilitation, Phase 1 Furnish labor and materials, and equipment to extend 12-inch sludge drying bed drain pipes and install manholes in order to clean and TV-inspect the drain pipes. 04/22/08 ADD 1 Bid Notice
Planholders
Specifications
Plans
Inspection Video
Bid Tab
Award
6-C-79 04/29/08 Centennial Park General site work for the central portion of the park including plaza, stage, brick retaining wall, concrete, brick banding, electrical, pavement restoration. 04/15/08   Bid Notice
Planholders
Specifications
Plans
Bid Tab
Award
08-C-00019 04/29/08 Howard F Curren AWTP Final Sedimentation Tanks Rehabilitation, Phase 1 Removal of existing cross collector flights, shafts and wear strips in six sedimentation tanks. 04/15/09 ADD 1 Bid Notice
Specifications
Plans
Planholders
Bid Tab
Award
08-C-00032 04/08/08 Columbus Drive Municipal Office Building HVAC Replacement and Upgrades Replacement of existing rooftop HVAC equipment. 03/18/08 ADD 1
ADD 2
ADD 3
Bid Notice
Planholders
Specifications
Plans
Bid Tab
Award
08-C-00016 04/01/08 Howard F. Curren AWTP Sludge Storage Tanks Rehabilitation The project provides for furnishing all labor, materials, and equipment to remove existing mixing equipment and tank baffles. 03/18/08 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-26 04/01/08 Fire Station No. 1 Roof Improvements Removal of existing roof membrane and installation of built-up roof membrane. 03/18/08 ADD 1
ADD 2
ADD 3
Bid Notice
Planholders
Bid Tab
Award
7-C-94 04/29/08 Ballast Point Park Pier Improvements Rehabilitation of the existing fishing pier encasement of degraded concrete bent caps and piles. 02/19/08 ADD 1
ADD 2
ADD 3
ADD 4
Bid Notice
Planholders
Bid Tab
Specifications
Award
08-C-00026 03/18/08 Manhole Rehabilitation by Structural Coating System Rehabilitate 41 Manholes in the Bayshore, Bush, and Platt Interceptors by installation of a structural coating system. 02/26/08 ADD 1 Bid Notice
Planholders
Bid Tab
Award
08-C-00023 03/11/08 Annual Wastewater Force Main Replacement Construction of 6,150 linear feet of 4-inch through 12-inch diameter PVC, HDPE and/or DIP force main sewer pipe.   ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
6-C-53 02/26/08 Robles Park Roof Replacement Renovation of portions of the entry roofs at the Robles Park Building. 2/12/088   Bid Notice
Planholders
Bid Tab
Award
08-C-00008 03/04/08 Lake Kipling Urban Lakes Rescue Construction of three pre-cast concrete sediment traps including removal of excess sediment from Lake Kipling. 02/12/08 ADD 1
ADD 2
ADD 3
Bid Notice
Planholders
Bid Tab
Award
08-C-00025 01/22/08 Waverly Place Stormwater Pipe Relocation Construction of concrete stormwater system.   ADD 1 Bid Notice
Planholders
Bid Tab
Award
08-C-00009 01/22/08 Temple Heights Road Stormwater Improvements Construction of stormwater pipe system to reduce flooding in neighborhood.     Bid Notice
Planholders
Bid Tab
Award
08-C-00004 01/22/08 Kinnan Pumping Station Rehabilitation Removal and installation of control equipment, emergency generators, station piping, pumps, valves, access cover doors, chain link fence, water service. 01/08/08 ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
08-C-00003 01/22/08 Manhole Rehabilitation of Clark Phase 2 and Various Interceptors Rehabilitate 80 manholes in various locations throughout the City of Tampa. 12/18/07 ADD 1
ADD 2
ADD 3
Bid Notice
Planholders
Bid Tab
Award
07-C-00081 01/08/08 HFC AWTP Heat Drying Facility Rehabilitation Rehabilitate the building roof and gutter system, replace interior structural members, and apply corrosion control coating system on interior steel components.
Bid Has Been Cancelled
11/13/07 ADD 1
ADD 2
Bid Notice
Planholders
08-C-00002 01/08/08 Sewer Rehabilitation by Cured-in-Place Pipe (C.I.P.P.) Small Diameter FY08 The rehabilitation of gravity sewers from 8-inch diameter to 12-inch diameter at various locations throughout the City of Tampa.   ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-75 12/18/07 Tampa Reclaimed Water System Performance Improvements Construct test and maintain reclaimed water flushing services and new system appurtenances for the reclaimed water system, and conducting a unidirectional flushing of the transmission main, distribution piping and service lines. 12/04/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-10 11/27/07 Cypress Point Park Shoreline Stabilization Removing of sand berms and bars, providing groins system, beach sand, plantings, complying with permit requirements. 11/06/07 ADD 2 Bid Notice
Planholders
Bid Tab
Award
08-C-00001 11/20/07 Wastewater Gravity Sewer Construction FY08 Construction of 2600 linear feet of 6  and 8 inch diameter PVCP, including asphalt pavement restoration, concrete driveway and sidewalk restoration, sodding.   ADD 1
ADD 2
Bid Notice
Planholders
BidTab
Award
7-C-43
$20.00
$970,000
10/9/07 Sewer Rehabilitation by Cured-in-Place Pipe FY07 The rehabilitation of gravity sewers from 8-inch diameter to 36-inch diameter at various locations throughout the City.   ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
7-C-79
$20.00
$500,000
9/11/07 Howard F, Curren AWTP Chlorination System Upgrade Phase 2 Installation of a complete chlorine and sulfur dioxide system. 8/21/07 ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
7-C-69
$20.00
$575,000
8/28/07 River Garden Park Shoreline Restoration Restoration of approximately 2000 linear feet of Hillsborough River shoreline within the River Garden Park. 7/24/07 ADD 1
ADD 2
ADD 3
ADD 4
Bid Notice
Planholders
Bid Tab
Award
7-C-63
$20.00
$160,000
8/28/07 TPD Aviation Unit Fuel Tank Replacement Replaces an underground fuel storage tank with an above ground fuel storage tank for the TPD Aviation Unit. 8/14/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-61
$20.00
$435,000
8/28/07 New Tampa Nature Park Improvements Work shall include 1/2 mile entrance road, asphalt parking lot of 24 spaces, stormwater control elements, concrete walks, 1/2 mile asphalt trail. 7/31/07 ADD 1
ADD 2
ADD 3
LOC 1
Bid Notice
Planholders
Bid Tab
Award
7-C-76
$20.00
$530,000
8/21/07 Howard F. Curren AWTP Digester No. 6 Rehabilitation, Phase 1 Transport and dispose of waste materials stored in the drying beds at the Howard F. Curren Advanced Wastewater Treatment Plant. 8/07/07 LOC 1 Bid Notice
Planholders
Bid Tab
Award
7-C-31
$20.00
$190,000
8/21/07 Twiggs Street Garage Improvements Concrete restoration work up to full depth for slabs, beams and columns on the top levels of the garage including the installation of supplemental drains.  8/07/07   Bid Notice
Planholders
Bid Tab
Award
6-C-54
$20.00
$300,000
8/21/07 Cypress Point Park Restroom Building Installation of pre-fabricated building, including foundation, testing and inspections. 7/24/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-20
$20.00
$210,000
8/14/07 San Carlos Pumping Station Flow Meter Replacement and Emergency Bypass Connection Installation of 2 flow meters at the San Carlos Pumping station with all associated piping modifications. 7/24/07 ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-15
$20.00
300,000
8/07/07 Cancer Survivor Park Drainage Ditch Improvements Installing precast reinforced piping into an existing open ditch and filling the slope to provide overhead cover. 7/24/07 ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
7-C-84
$20.00
$400,000
7/31/07 Lake Roberta-Urban Lake Rescue Project The project provides construction of approximately 250 If  2 grate inlets, 1 endwall. 7/17/07 ADD 1
LOC 1
Bid Notice
Planholders
Bid Tab
Award
6-C-77
$20.00
$200,000
7/17/07 Fire Training Burn Prop. The project provides for the design and engineering manufacturing, transporting, permitting and installation of modular containers to provide a fire training burn building that complies with, or provides for future compliance with, Florida Statue 69A-37, including tie-downs, utility connections. N/A ADD 1 Bid Notice
PlanHolders
Bid Tab
Award
7-C-54
$20.00
$400,000
7/17/07 46th Street and Riverhills Drive Stormwater Sediment Trap The project provides for furnishing all labor, materials and equipment for construction of approximately 177 l.f. of 18" diameter, 155 l.f. of 24" diameter, and 16 l.f. of 19" x 30" elliptical stormwater pipe, 1 doghouse manhole, 6 inlets, 1 headwall including riprap, clean fill, and one precast concrete stormwater sediment trap structure and diversion box including roadway base, stabilization, force main offsets, water line adjustments, asphalt paving, concrete sidewalks and driveways, sodding, root pruning. N/A ADD 1 Bid Notice
Plan Holders
Bid Tab
Award
7-C-33
$20.00
$500,000
7/17/07 Annual Wastewater Force Main Replacement Construction of miscellaneous wastewater force mains at various locations throughout the City. N/A ADD 1 Bid Notice
Planholders
Bid Tab
Award
7-C-52
$20.00
$345,000
7/10/07 Howard F. Curren AWTP Nitrification Pumps AFD Replacement Removal of 5 existing frequency drives and 2 speed motor controllers the replacement of 7 new AFD's and all associated work required. 6/26/07   Bid Notice
Planholders
Bid Tab
Award
7-C-82
$20.00
$208,000
06/26/07 West Columbus Drive and Riverside Drive Stormwater Sediment Trap Project provides for furnishing all labor and construction of one stormwater sediment trap. N/A ADD 1
ADD 2
Bid Notice
Planholders
Bid Tab
Award
7-C-55
$20.00
$300,000
06/26/07 Curb and Gutter Construction-Citywide Construction of concrete curb and gutter at various locations throughout the City. N/A ADD 1
Bid Notice
Planholders
Bid Tab
Award
7-C-51
$20.00
$850,000
06/26/07 Sierra Circle Stormwater Pipe Relocation, Phase 1 Construction of concrete pipe storm sewer, including inlets, manholes, concrete curbing and driveways. 06/12/07 ADD 1
ADD 2
LOC 1
LOC 2
Bid Notice
Planholders
Bid Tab
Award
7-C-34
$20.00
$690,000
06/12/07 City-Wide Traffic Calming Devices FY07 Project provides for construction and installation of various traffic calming devices including the installation of speed tables, signage, pavement markings, sidewalks, curbing, landscaping and asphalt pavement 05/29/07   Bid Notice
Planholders
Bid Tab
Award
7-C-53
$20.00
$19,000,000
05/22/07 Water Main Construction Project provides for furnishing and installing water mains and appurtenances for water mains ranging in size from 2” to 42” in diameter. 05/08/07 ADD 1
Bid Notice
Planholders
Bid Tab
Award
7-C-7
$20.00
$220,000
05/22/07 Sidewalk Construction FY07 Bayshore Blvd and East Tampa Construction of sidewalks and installation of pedestrian ramps at various locations. 03/20/07 ADD 1
ADD 2
ADD 3
ADD 4
Bid Notice
Planholders
Bid Tab
Award
7-C-17
$20.00
$575,000
05/17/07 Carmen Pumping Station Rehabilitation and Force Main Replacement Rehabilitation of Carmen Pumping Station located at 3606 W. Carmen Street and the replacement of the station's discharge force main.  The force main replacement consists of installing approximately 1,735 of 8" PVC/HDPE pipe. N/A ADD 1 Bid Notice
Planholders
Bid Tab
Award
6-C-12
$20.00
$1,145,000
04/24/07 Cyrus Green Pool Improvements Demolition of south wall of existing pool, construction of new pool decks, renovation of existing equipment building 03/27/07 ADD 1 ADD 2
ADD 3